Organize structural steel logistics with Fabbim

Connect assemblies, packages, truck loads and site receiving to follow the movement of steelwork through a project.

What steelwork logistics includes

Logistics covers preparation, grouping, loading, transport, receiving and availability for erection. It connects the workshop, external partners where involved, and the construction site.

Deliver according to site needs

A delivery is useful when the required assemblies arrive in a sequence the site can handle. Missing items or unclear contents can affect an erection area even when fabrication is progressing elsewhere.

Start preparation in the workshop

Identify the assemblies actually ready to leave and review the relevant phase or site zone. Prepare the load around the delivery needs instead of waiting until the truck is ready to depart.

Group objects into packages

Packages bring together parts or assemblies according to handling, transport or site needs. They provide a working level between individual objects and a truck load.

Record truck loading

Associate the actual loaded objects with the correct truck. Check their identity and the intended delivery phase, then review the contents before confirming departure.

Follow the transport stages

After dispatch, use the recorded status to identify which objects are in transit and expected on site. Keep the site informed using the same load reference.

Check actual receiving

Scan objects at arrival and compare them with the recorded load. Receiving confirms which assemblies are available, rather than relying only on an announced truck arrival.

Use a clear logistical workflow

A workflow connects stages such as ready, loaded, in transit and received. Define the actions confirming each transition and use the same meanings across the teams.

Prepare site work

Confirmed deliveries help the site organize storage and identify assemblies available for the next erection sequence. Review missing items before preparing the work area.

Review the logistical history

Preparation, departure, receiving and return records can help reconstruct an assembly’s route. Consult the sequence when investigating a discrepancy or clarifying a handover.

A practical logistical sequence

  1. Identify assemblies ready for dispatch.
  2. Organize packages around site needs.
  3. Load and check the truck by phase or zone.
  4. Record departure and transport progress.
  5. Confirm objects received on site.
  6. Prepare the next site operation.

Coordinate the whole route

Connected records give workshop, transport and site teams a common view of the objects involved. This supports load preparation, discrepancy checks and delivery planning.

Good practice

Prepare departures before the loading operation, use coherent groups and scan at the relevant handovers. Keep fabrication records, truck contents and receiving checks consistent.

Maintain continuity from workshop to site

Steelwork logistics depends on knowing which assemblies move at each stage. Use the same identifiers and project structure throughout preparation, transport and receiving.

Frequently asked questions

Does logistics start when the truck leaves?

No. It starts in the workshop with identifying ready objects, organizing groups and preparing the delivery sequence.

Why confirm receiving after tracking transport?

Receiving checks which objects actually arrived and makes partial or incorrect deliveries visible.

How do packages and trucks relate?

A package groups objects for handling or delivery; a truck carries the groups and objects assigned to that transport.